First blast of Tunnel Posted on June 1, 2016July 6, 2016 by Singati Hydro On the Date of 28th May, 2016 , First blast of the Tunnel at inlet site is done at the location site at Singati, Dolakha. The total Head Race Tunnel of Singati Hydro Power project is 5824 meter.