Singati Hydro Energy Ltd. Singati Hydro Energy Ltd. was established to spearhead the development of the Singati Khola Hydropower Project (25MW). Nestled in the northeastern part of Dolakha district, this project stands out as one of the Super Six initiatives awarded to the private sector through a rigorous national bidding process. Setting itself apart, Singati Hydro Energy Ltd. undertook the monumental task of excavating a 6-kilometer-long tunnel and laying a 26-kilometer-long Transmission Line, marking significant milestones in the project's execution. Total paid up capital of the company is worth NPR 2.9 Billion . Venturing beyond borders, Singati Hydro Energy Ltd., in collaboration with Orbit Energy Ltd., is actively engaged in constructing two hydropower projects in Sankhuwasabha district in eastern Nepal—Sabha Khola B Hydropower Project (21.5 MW) and Sabha Khola C Hydropower Project (6.2 MW). The Power Purchase Agreements for these projects were inked on 10th July 2017 and 24...
Read More .....Welcome everyone. We are the pioneer in the field of hydropower energy. We believe we optimize the very source of our Nepali hydropower energy and give the country strength in the economic field. It is told the world that Nepal is the second largest country ha...
Read More...Water resources are the major natural resources identified for the development of Nepal. In fact, the perennial nature of Nepali rivers and the steep gradient of the country's topography provide ideal conditions for the development of some of the world's large...
Read More...The design discharge of the Singati Khola Hydropower Project is 11.3 m3/sec .The total headrace tunnel length of the project is 5824m & 719 m of penstock pipe. The headworks & about 4.8 km length of tunnel of the project is located on the Babare VDC of...
Read More...